Vande Bharat with broken brakes ran 463 km, railway probe finds

By News Desk — API··~1 min read

A Vande Bharat rake moved from Jharkhand to Uttar Pradesh in October had its braking systems completely disabled, forcing it to rely solely on the locomotive's brakes for the entire 463 km journey, according to The Hindu. Railway staff ignored repeated warnings from two different pilots about the faulty performance.

Controllers at Ranchi and Muri stations disregarded complaints and allowed the train to proceed. The issue was only addressed when the rake reached Deen Dayal Upadhyaya station. An investigation by the South Eastern Railway identified negligence across multiple levels: maintenance teams failed to inspect the coaches before departure, controllers dismissed safety concerns, and operators lacked training on the Vande Bharat's systems.


Source: The Hindu — National — read the original report ↗
Reported on Sun, 15 Nov 2026 14:53:32 GMT.

Share